The Structured Products are Non-collateralised
The Structured Products are Non-collateralised
Last Update: -
19608 GJPOMRT@EP2601B Delay Time Quote
  • Open
  • Last Close
  • Turnover
  • High
  • Low
  • Volume
Bid (Delayed*) 0.131 Ask (Delayed*) 0.132
Issuer GJ Type Put
Strike 218.68 ITM / OTM 31.6% OTM
Maturity (Y-M-D) 2026-01-05 Daily Theta (%) -1.3%
Last Trading Day (Y-M-D) 2025-12-29 Days to Maturity 130 Days
Terms & Indicator
Effective Gearing 3.4 X Delta(%) -14.0%
Implied Volatility 77.0% IV Sensitivity (%) 3.2%
Premium 35.7% Breakeven Point 205.48
Outstanding Qty 0.82 (M) Outstanding Qty 1.2%
Entitlement Ratio 100 Lot size 20,000
Underlying (Delayed*)
319.80
-2.400 (-0.74%)
Open 322.00 Prev. Close 322.20 Ref. Level at 4PM 322.40
High 325.00 Low 314.00 Turnover 2.0B
Related GTJA Warrants and CBBCs
Last Update :
Last Update: -