The Structured Products are Non-collateralised
The Structured Products are Non-collateralised
Last Update: -
20743 GJALIBA@EP2603A Delay Time Quote
  • Open
  • Last Close
  • Turnover
  • High
  • Low
  • Volume
Bid (Delayed*) 0.079 Ask (Delayed*) 0.080
Issuer GJ Type Put
Strike 142.78 ITM / OTM 5.4% OTM
Maturity (Y-M-D) 2026-03-09 Daily Theta (%) -1.0%
Last Trading Day (Y-M-D) 2026-03-03 Days to Maturity 90 Days
Terms & Indicator
Effective Gearing 6.5 X Delta(%) -34.1%
Implied Volatility 40.9% IV Sensitivity (%) 3.5%
Premium 10.6% Breakeven Point 134.88
Outstanding Qty 6.23 (M) Outstanding Qty 6.2%
Entitlement Ratio 100 Lot size 10,000
Underlying (Delayed*)
150.90
-2.500 (-1.63%)
Open 155.10 Prev. Close 153.40 Ref. Level at 4PM 153.20
High 156.80 Low 150.40 Turnover 10.6B
Related GTJA Warrants and CBBCs
Last Update :
Last Update: -