The Structured Products are Non-collateralised
The Structured Products are Non-collateralised
Last Update: -
21105 GJ-SMIC@EC2604C Delay Time Quote
  • Open
  • Last Close
  • Turnover
  • High
  • Low
  • Volume
Bid (Delayed*) 0.222 Ask (Delayed*) 0.227
Issuer GJ Type Call
Strike 89.86 ITM / OTM 12.2% OTM
Maturity (Y-M-D) 2026-04-22 Daily Theta (%) -0.5%
Last Trading Day (Y-M-D) 2026-04-16 Days to Maturity 176 Days
Terms & Indicator
Effective Gearing 3.6 X Delta(%) 50.4%
Implied Volatility 64.9% IV Sensitivity (%) 1.9%
Premium 26.4% Breakeven Point 101.21
Outstanding Qty 8.77 (M) Outstanding Qty 12.5%
Entitlement Ratio 50 Lot size 2,500
Underlying (Delayed*)
80.10
-2.700 (-3.26%)
Open 82.80 Prev. Close 82.80 Ref. Level at 4PM 83.05
High 85.50 Low 80.05 Turnover 10.3B
Related GTJA Warrants and CBBCs
Last Update :
Last Update: -