The Structured Products are Non-collateralised
The Structured Products are Non-collateralised
Last Update: -
26426 GJ-CMOB@EP2501B Delay Time Quote
  • Open
  • Last Close
  • Turnover
  • High
  • Low
  • Volume
Bid (Delayed*) N/A Ask (Delayed*) N/A
Issuer GJ Type Put
Strike 66.75 ITM / OTM 11.4% OTM
Maturity (Y-M-D) 2025-01-17 Daily Theta (%) -12.4%
Last Trading Day (Y-M-D) 2025-01-13 Days to Maturity 28 Days
Terms & Indicator
Effective Gearing N/A Delta(%) N/A
Implied Volatility N/A IV Sensitivity (%) N/A
Premium N/A Breakeven Point 66.65
Outstanding Qty 2.92 (M) Outstanding Qty 4.2%
Entitlement Ratio 10 Lot size 5,000
Underlying (Delayed*)
75.35
-0.150 (-0.20%)
Open 75.30 Prev. Close 75.50 Ref. Level at 4PM 75.65
High 75.75 Low 74.85 Turnover 1.4B
Related GTJA Warrants and CBBCs
Last Update :
Last Update: -