The Structured Products are Non-collateralised
The Structured Products are Non-collateralised
Last Update: -
56805 BP#SMIC RC2602D Delay Time Quote
  • Open
  • Last Close
  • Turnover
  • High
  • Low
  • Volume
Bid (Delayed*) 0.032 Ask (Delayed*) 0.034
Issuer BP Type Bull
Call Level 43.8 Strike 43.2
Maturity (Y-M-D) 2026-02-26 ITM / OTM 6.0% ITM
Last Trading Day (Y-M-D) 2026-02-25 Days to Maturity 230
Terms & Indicator
Effective Gearing 13.5 X Delta (%) N/A
Funding Cost 0.007 Premium 1.4%
Funding Cost (Annual%) 2.39% Breakeven Point 46.60
Outstanding Qty 0.00(M) Outstanding Qty 0.0%
Entitlement Ratio 100 Lot size 5,000
Underlying (Delayed*)
45.95
+1.000 (+2.23%)
Open 44.75 Prev. Close 44.95 Ref. Level at 4PM 44.95
High 46.85 Low 44.75 Turnover 3.9B
Related GTJA Warrants and CBBCs
Last Update :
Last Update: -