The Structured Products are Non-collateralised
The Structured Products are Non-collateralised
Last Update: -
14801 GJ-CMOB@EP2509A Delay Time Quote
  • Open
  • Last Close
  • Turnover
  • High
  • Low
  • Volume
Bid (Delayed*) 0.056 Ask (Delayed*) 0.057
Issuer GJ Type Put
Strike 72.45 ITM / OTM 18.8% OTM
Maturity (Y-M-D) 2025-09-30 Daily Theta (%) -1.9%
Last Trading Day (Y-M-D) 2025-09-24 Days to Maturity 117 Days
Terms & Indicator
Effective Gearing 16.2 X Delta(%) -10.4%
Implied Volatility 22.5% IV Sensitivity (%) 15.0%
Premium 19.4% Breakeven Point 71.88
Outstanding Qty 0.31 (M) Outstanding Qty 0.5%
Entitlement Ratio 10 Lot size 5,000
Underlying (Delayed*)
89.20
+0.350 (+0.39%)
Open 89.00 Prev. Close 88.85 Ref. Level at 4PM 88.95
High 89.35 Low 88.50 Turnover 2.0B
Related GTJA Warrants and CBBCs
Last Update :
Last Update: -