The Structured Products are Non-collateralised
The Structured Products are Non-collateralised
Last Update: -
16760 GJ-AIA @EP2607A Delay Time Quote
  • Open
  • Last Close
  • Turnover
  • High
  • Low
  • Volume
Bid (Delayed*) 0.074 Ask (Delayed*) 0.075
Issuer GJ Type Put
Strike 55.83 ITM / OTM 18.6% OTM
Maturity (Y-M-D) 2026-07-24 Daily Theta (%) -0.3%
Last Trading Day (Y-M-D) 2026-07-20 Days to Maturity 382 Days
Terms & Indicator
Effective Gearing 4.1 X Delta(%) -22.3%
Implied Volatility 34.7% IV Sensitivity (%) 5.4%
Premium 24.0% Breakeven Point 52.13
Outstanding Qty 2.04 (M) Outstanding Qty 2.9%
Entitlement Ratio 50 Lot size 10,000
Underlying (Delayed*)
68.60
-0.550 (-0.80%)
Open 68.65 Prev. Close 69.15 Ref. Level at 4PM 69.20
High 69.15 Low 68.60 Turnover 355.9M
Related GTJA Warrants and CBBCs
Last Update :
Last Update: -