The Structured Products are Non-collateralised
The Structured Products are Non-collateralised
Last Update: -
24567 GJALIBA@EP2607A Delay Time Quote
  • Open
  • Last Close
  • Turnover
  • High
  • Low
  • Volume
Bid (Delayed*) 0.230 Ask (Delayed*) 0.232
Issuer GJ Type Put
Strike 127.28 ITM / OTM 3.6% OTM
Maturity (Y-M-D) 2026-07-24 Daily Theta (%) -0.6%
Last Trading Day (Y-M-D) 2026-07-20 Days to Maturity 127 Days
Terms & Indicator
Effective Gearing 4.5 X Delta(%) -39.6%
Implied Volatility 44.9% IV Sensitivity (%) 2.6%
Premium 12.3% Breakeven Point 115.78
Outstanding Qty 0.17 (M) Outstanding Qty 0.2%
Entitlement Ratio 50 Lot size 5,000
Underlying (Delayed*)
132.00
-5.700 (-4.14%)
Open 132.70 Prev. Close 137.70 Ref. Level at 4PM 138.20
High 134.20 Low 131.20 Turnover 14.8B
Related GTJA Warrants and CBBCs
Last Update :
Last Update: -