The Structured Products are Non-collateralised
The Structured Products are Non-collateralised
Last Update: -
24567 GJALIBA@EP2607A Delay Time Quote
  • Open
  • Last Close
  • Turnover
  • High
  • Low
  • Volume
Bid (Delayed*) 0.124 Ask (Delayed*) 0.125
Issuer GJ Type Put
Strike 127.28 ITM / OTM 7.7% OTM
Maturity (Y-M-D) 2026-07-24 Daily Theta (%) -1.4%
Last Trading Day (Y-M-D) 2026-07-20 Days to Maturity 71 Days
Terms & Indicator
Effective Gearing 7.0 X Delta(%) -31.7%
Implied Volatility 44.5% IV Sensitivity (%) 3.5%
Premium 12.2% Breakeven Point 121.08
Outstanding Qty 0.10 (M) Outstanding Qty 0.1%
Entitlement Ratio 50 Lot size 5,000
Underlying (Delayed*)
137.90
+5.100 (+3.84%)
Open 143.10 Prev. Close 132.80 Ref. Level at 4PM 132.70
High 144.00 Low 137.60 Turnover 22.0B
Related GTJA Warrants and CBBCs
Last Update :
Last Update: -