The Structured Products are Non-collateralised
The Structured Products are Non-collateralised
Last Update: -
25373 GJHZROB@EC2607A Delay Time Quote
  • Open
  • Last Close
  • Turnover
  • High
  • Low
  • Volume
Bid (Delayed*) 0.075 Ask (Delayed*) 0.076
Issuer GJ Type Call
Strike 10.67 ITM / OTM 34% OTM
Maturity (Y-M-D) 2026-07-10 Daily Theta (%) -0.9%
Last Trading Day (Y-M-D) 2026-07-06 Days to Maturity 156 Days
Terms & Indicator
Effective Gearing 3.8 X Delta(%) 36.7%
Implied Volatility 73.4% IV Sensitivity (%) 2.6%
Premium 43.6% Breakeven Point 11.43
Outstanding Qty 0.00 (M) Outstanding Qty 0.0%
Entitlement Ratio 10 Lot size 6,000
Underlying (Delayed*)
7.96
-0.130 (-1.61%)
Open 8.09 Prev. Close 8.09 Ref. Level at 4PM 8.09
High 8.10 Low 7.79 Turnover 955.6M
Related GTJA Warrants and CBBCs
Last Update :
Last Update: -