The Structured Products are Non-collateralised
The Structured Products are Non-collateralised
Last Update: -
29083 GJ-SMIC@EP2611A Delay Time Quote
  • Open
  • Last Close
  • Turnover
  • High
  • Low
  • Volume
Bid (Delayed*) 0.223 Ask (Delayed*) 0.225
Issuer GJ Type Put
Strike 59.8 ITM / OTM 22.7% ITM
Maturity (Y-M-D) 2026-11-30 Daily Theta (%) -0.1%
Last Trading Day (Y-M-D) 2026-11-24 Days to Maturity 18 Days
Terms & Indicator
Effective Gearing 4.3 X Delta(%) -97.0%
Implied Volatility 47.3% IV Sensitivity (%) 0.1%
Premium 0.1% Breakeven Point 48.70
Outstanding Qty 9.43 (M) Outstanding Qty 18.9%
Entitlement Ratio 50 Lot size 25,000
Underlying (Delayed*)
48.74
-0.260 (-0.53%)
Open 49.32 Prev. Close 49.00 Ref. Level at 4PM 49.06
High 51.55 Low 48.64 Turnover 5.5B
Related GTJA Warrants and CBBCs
Last Update :
Last Update: -