The Structured Products are Non-collateralised
The Structured Products are Non-collateralised
Last Update: -
29971 GJLENOV@EP2612A Delay Time Quote
  • Open
  • Last Close
  • Turnover
  • High
  • Low
  • Volume
Bid (Delayed*) 0.089 Ask (Delayed*) 0.090
Issuer GJ Type Put
Strike 15 ITM / OTM 41.7% OTM
Maturity (Y-M-D) 2026-12-02 Daily Theta (%) -1.0%
Last Trading Day (Y-M-D) 2026-11-26 Days to Maturity 182 Days
Terms & Indicator
Effective Gearing 3.0 X Delta(%) -10.5%
Implied Volatility 76.8% IV Sensitivity (%) 3.6%
Premium 45.2% Breakeven Point 14.10
Outstanding Qty 0.04 (M) Outstanding Qty 0.1%
Entitlement Ratio 10 Lot size 20,000
Underlying (Delayed*)
25.74
-0.840 (-3.16%)
Open 24.50 Prev. Close 26.58 Ref. Level at 4PM 26.74
High 26.72 Low 24.46 Turnover 5.6B
Related GTJA Warrants and CBBCs
Last Update :
Last Update: -