The Structured Products are Non-collateralised
The Structured Products are Non-collateralised
Last Update: -
29971 GJLENOV@EP2612A Delay Time Quote
  • Open
  • Last Close
  • Turnover
  • High
  • Low
  • Volume
Bid (Delayed*) 0.095 Ask (Delayed*) 0.097
Issuer GJ Type Put
Strike 15 ITM / OTM 29.5% OTM
Maturity (Y-M-D) 2026-12-02 Daily Theta (%) -1.0%
Last Trading Day (Y-M-D) 2026-11-26 Days to Maturity 156 Days
Terms & Indicator
Effective Gearing 3.5 X Delta(%) -15.8%
Implied Volatility 67.6% IV Sensitivity (%) 3.4%
Premium 34.0% Breakeven Point 14.04
Outstanding Qty 1.24 (M) Outstanding Qty 2.5%
Entitlement Ratio 10 Lot size 20,000
Underlying (Delayed*)
21.28
-2.160 (-9.21%)
Open 23.18 Prev. Close 23.44 Ref. Level at 4PM 23.50
High 23.40 Low 20.76 Turnover 3.5B
Related GTJA Warrants and CBBCs
Last Update :
Last Update: -