The Structured Products are Non-collateralised
The Structured Products are Non-collateralised
Last Update: -
29971 GJLENOV@EP2612A Delay Time Quote
  • Open
  • Last Close
  • Turnover
  • High
  • Low
  • Volume
Bid (Delayed*) 0.046 Ask (Delayed*) 0.047
Issuer GJ Type Put
Strike 15 ITM / OTM 35.5% OTM
Maturity (Y-M-D) 2026-12-02 Daily Theta (%) -1.6%
Last Trading Day (Y-M-D) 2026-11-26 Days to Maturity 134 Days
Terms & Indicator
Effective Gearing 4.7 X Delta(%) -9.5%
Implied Volatility 63.7% IV Sensitivity (%) 5.0%
Premium 37.5% Breakeven Point 14.53
Outstanding Qty 4.42 (M) Outstanding Qty 8.8%
Entitlement Ratio 10 Lot size 20,000
Underlying (Delayed*)
23.24
+1.820 (+8.50%)
Open 22.24 Prev. Close 21.42 Ref. Level at 4PM 21.26
High 23.36 Low 21.64 Turnover 2.3B
Related GTJA Warrants and CBBCs
Last Update :
Last Update: -